Metric was assigned to provide basic design, bidding assistance for EPC, design review, and construction supervision for the 115 kV supply project.
The new 115 kV switchyard is located in Michelin Laemchabang, Tungsukla, Chonburi province.
The switchyard was constructed together with the main substation building and unit substation building to support production increases and future expansion projects.