The LMC PF2 Bourapa Phase B Project, a continuation of phase A, involves constructing a building extension and conducting related relocation works for the existing cooling tower, chemical storage, and gas storage facilities. The project includes:
- Production Workshop Extension: involving demolition and modification of the existing workshop, and extension of a new building (total extension area ~1,854 m2).
- Relocation works for Gas Storage
- Relocation works for Cooling Tower
- Relocation works for Chemical Storage
- Production Machine Foundation (300 m2)